OUR projects
Domestic
Storage Tank Farm 2 Project

Samutprakarn

|

Paint

Fabrication and Installation for Storage Tank 70m3
GCRCP Project

Prachinburi

|

Paper Mill

Tank & Tower Erection: 430 Tons , Machine Installation: 1.500 Tons , Piping work: 45,000 DB
Fabrication and Installation Mono Cyclone

Kanchanaburi

|

MDF Plant

Fabrication and Installation Mono Cyclone
New Boiler - Metro HPL Project

Nonthaburi

|

Paper Laminate

Fabrication and Installation work for Conveyor, Termal Oil Piping
M.D.F. Line Upgrade Project

Kanchanaburi

|

MDF Plant

Fabrication & Installation , Machine Installation, Piping work:6,000 DB
Abrasive Plant Project

Chonburi

|

Paint Manufacturing Plant

Fabrication work: 90 Tons, Installation work: 280 Tons, Painting work: 3640 Sq.m
Total Engineering (Thailand) Co., Ltd

Ubonratchathani

|

Trading Company

Fabrication of Carbon Steel Pipe Spool
National Power Supply Public Co., Ltd

Prachinburi

|

Power Plant

Installation work for Coal Sampling System
M.D.F. Line 2 Upgrade Project

Kanchanaburi

|

MDF Plant

Erection and Fabrication: 319.85 Tons
Double A - RCP Project

Prachinburi

|

Engineering & Construction

Mechanical Erection and Piping work: 40000 DB
CASTM1 Project

Singburi

|

Paper Mill

Mechanical Erection for CASTM1 Project: 25000 DB
CASTM1 Project

Singburi

|

Paper & Pulp Mill

Mechanical Erection for CASTM1 Project
Moresco (Thailand) Co., Ltd

Chonburi

|

Solvent Extraction Plant

Modification Civil Area Tank and Renovated Pump Modification Piping and Electrical Scada Loadcell
Glazing Robot Project

Saraburi

|

Ceramic Plant

Foundation and Ceiling work
Charnyut Project

Loei

|

-

Platework Fabrication: 130 Tons
Clycerine II Project

Choburi

|

Chemical Plant

Mechanical & Installation: 120 Tons Piping Work: 20000 DB
Total Engineering (Thailand) Co., Ltd

Ubonratchathani

|

Trading Company

Fabrication of Carbon Steel Pipe Spool
TTL Plant 1 & 2 Project

Saraburi

|

Ceramic Plant

Machine fabrication & Piping work
PB1 , PB2 and PB3 Project

Nonthaburi, Prachinburi, Karnchanaburi

|

Particle Board Plant

Fabrication and Installation work
Green Fiber Co., Ltd

Chachoengsao

|

-

งานยกหลังคาอาคาร Hot Press line 1 บริเวณกริต Line A-E, 27-30 งานโครงสร้างเหล็กรองรับ Overhead Crane 30 Tons
Total Engineering (Thailand) Co., Ltd

Ubonratchathani

|

Trading Company

Fabrication of Carbon Steel Pipe Spool
TOA Tank T-2112 Project

Samutprakan

|

Paint Manufacturing Plant

Storage Tank 30 M3 and Piping
Thai Steel Profile Public Co.,Ltd.

Rayong

|

Steel Plant

Dismantle & Installation for Piping
Modification work Project

Ayutthaya

|

Food Plant

Fabrication , Demolish and Installation work
TPC 1 Project

Karnchanaburi

|

Kraft Paper

Fabrication & Installation for Tank
Brake Fluid Project (Air Dryer)

Chonburi

|

Solvent Extraction Plant

Civil, Fabrication and Installation
TTL Plant 1 & 2 Project

Saraburi

|

Ceramic Plant

Grinding machine TTL1 SUS Blade for Fabrication Multi Casting Room for PVC Screen Mechanical work for Sink and Piping for CI/Glazing Process Mechanical work for Glost Inspection MC Equipment and Installation
Siam Paper Laminte Project

Nonthaburi

|

Particle Board Plant

HPL SHW Piping System Steel Structure for Tank 15 Tons Fabrication of Glue Pan Fabrication of Lift for Paper Roll
Chipping Line Machine Installation

Suratthani

|

Particle Board Plant

Equipment Installation: 71551 Kg Steel Structure & Support Conveyor & Base plate of M/C: 18180 Kg Steel Structure for Chipper Machine: 2364 Kg
RM 1 Project

Rayong

|

Steel Plant

Dismantle & Installation Equipment: 306 Tons
TTL Plant 2 Project

Saraburi

|

Ceramic Plant

Mechanicalwork for Multi-Casting MC Equipment and Installation (CW 6 sets / L4 Sets): 230 Tons Mechanical work for Slip Sending Tank and Platform Mechanical work for Plastic - Molding MC Equipment and Installation Mechanical work for Preparation Equipment for Tank Mechanical work for Robot Booth and Glazing Supply Device Mechanical work for Multi-Molding Mechanical work for Walk Way Conveyor Machine and Electrical work Mechanical work for Grinding Machine and Electrical work
Work shop Project

Chonburi

|

Solvent Extraction Plant

Work shop Building
HPL Project

Nonthaburi

|

Particle Board Plant

Storage tank with Agitator capacity 15,000 Liters 2 Tanks: 6240 Kg Utility Piping work Item C & E Stainless 304
Partical Board Line #2 Project

Nonthaburi

|

Particle Board Plant

Fabrication Cyclone 5400 + Duct Outlet Dryer
Partical Board Line #3 Project

Prachinburi

|

Particle Board Plant

Steel Structure
M.D.F. Line No.4 Project

Karnchanaburi

|

MDF Plant

Steel Structure for Roof and Siding Under Dryer Cyclone Piping work of Energy Plant Firefly for Dryer and Forming: 4829 DB
Insulation for T2213 & T2210

Samuthprakarn

|

Paint Manufacturing Plant

Insulation work
M.D.F. Line No.4 Project

Kanchanaburi

|

MDF Plant

Local Fabrication and Installation for dryer Area and Energy Plant: 1330 Tons
Partical Board Line #3: Area for Chips cleaning, Flaking, Sawdust, Wet Silo, Energy Plant, Suction Plant, Dustfilters, Glue and Emulsion tanks, Production line Fabrication and Erection work

Prachinburi

|

Particle Board Plant

Steel Structure: 1870 Tons Platework (Silo, Duct, Chute, etc): 480 Tons Machine Installation: 1500 Tons Piping work (Stainless and carbon steel): 20000 DB Moving Floor for Fuel bin: 210 Tons
TRE Energy Plant Project

Saraburi

|

Ethanol Plant

Fabrication and Erection for Tanks: -
240 Aut/d SEMI-Chemical Pulp New Wood Handling Project

Kanchanaburi

|

Handling System

Conveyor & Equipment Installation work: 407 Tons
Dryer Cyclone / Hot Gas Cyclone

Suratthani

|

Particle Board Plant

Fabrication work: 133 Tons
Equipment Installation & Piping work

Samutsakorn

|

Steel Plant

Equipment Installation: 985.3 Tons Piping work: 12,536/7,053 DB/In-m
CCM Project

Samutprakarn

|

Steel Plant

Piping work: 10.136 Tons Fabrication part: 265 Tons Installation: 1000 Tons
SEC/GI Upgrading Project Phase-1

Rayong

|

-

Fabrication work: 18.9 Tons
SKIC PM2 Renovation Project

Ratchaburi

|

Paper Mill

Process Equipment & Waste Plant#1&2 Erection work
SKIC PM16 Project

Rachaburi

|

Paper Mill

Piping work and Installation : 63630 db Manpower Supply (Erection worker): - Insulation work: -
Fuel Handling System Project

Prachinburi

|

Power Plant

Erection work: 440 Tons
SCL-WS Recovery Package Project

Wangsala, Kanchanaburi

|

Dissolving Tank 20.48 Kg.
PM16 OCC Project

Rachaburi

|

Paper Mill

Piping work: 30000 DB Installation work: 660 Tons
Renovate

Saraburi

|

Ceramic Plant

Pipe Cooling Supply: 2000 DB
Production Expansion Floor & Equipments

Chonburi

|

Lube Oil Factory

Fire protection for Sprinkler Expension Area Production: 36000 Kg
Support for Electric Panel & Instruments and Pipe Rack

Songkla

|

-

Fabrication work: 13.46 Tons Painting work: 321 sq.m
Refinery Plant

Singburi

|

Mini Refinery

Structural Steel Fabrication: 120 Tons M/C Installation: 300 Tons Piping work: 10000 DB
Product Daily Tank

Saraburi

|

-

Tank and Installation: 11000 Kg
LQP2 Project

Prachinburi

|

Lime Mill

Piping work of Main Building: 26450 DB Machine Erection : Installation work: 494 Tons
Metro Project

Ayuthaya

|

Particle Board Plant

Exhaust Air Stack Fabrication part : 19.5 Tons
Storage Tank and Piping work

Uthaithani

|

Starch Plant

Storage Tank and Piping work
Batch House Plant

Saraburi

|

Glass Plant

Pipe, Heam, RB, Other
Box Girder

Saraburi

|

Glass Plant

Plate and Angle SS401
Fabricate activated carbon tanks

Songkla

|

-

Fabrication work: 68 Tons
Air receiver and Piping

Songkla

|

-

Fabrication work Piping work: 454 DB
T-1 Project

Rayong

|

-

Fabrication of Vessels
Pipe Spool work

Saraburi

|

-

Carbon Flange, Pipe Elbow, Cabon: 7275 Kg Carbon Steel Pipe: 5448 DB SUS Pipe: 1909 DB UPVC Pipe: 367 DB
Stain Plant

Saraburi

|

Ceramic Plant

Stain Plant: 24 Tons
Paper Mill3 Project

Prachinburi

|

Paper & Pulp Mill

Fabrication & Erection Silo Tank: 350 Tons Equipment Installation Stainless Tank Package (Inside PM Hall) Piping work Fabrication work: 15 Tons Piping work: 132801 DB Installation work: 112 Tons
Utility Piping System

Prachinburi

|

Ethanol Plant

Piping work: 30354 DB Insulation work: 4590 sq.m Painting work: 1930 sq.m
NPP5A/BOP Mechanical Erection

Prachinburi

|

-

High pressure alloy steel,carbon steel and stainless steel piping work: 14125 DB
AA-Quick Lime Plant

Prachinburi

|

-

Piping work: 1734 DB Insulation work: 864 m-d
Heavy Liquior Storage Tank

Khon Kaen

|

Power Plant

Tank work: 26141 Kgs
TOTO Sanitaryware Factory

Saraburi

|

Sanitary Plant

Equipment Installation,Piping work and Electrical work: The preparation building unit Wet scrubber and Ducting work Cycrodrive Base Plate : 51 Sets Platform Chiller Spray Robot Booth: 6 Sets Closet Casting Machine and Installation: 6 Sets
Automatic Storage for High Pressure Gas Cylinders

Rayong

|

High Pressure Gas Cylinder Plant

Steel Structure Fabrication & Installation: 38.6 Tons
Tempering Furnace and Reheating Furnace

Rayong

|

High Pressure Gas Cylinder Plant

Steel Structure Fabrication & Installation: 58.2 Tons
Steel Fabriction, Demolition & Installation (TECO 2008-01-072)

Saraburi

|

Glass Plant

Steel Structure Fabrication & Installation: 450 Tons
Hopper Fabriction, Demolition & Installation (ZIPPE)

Saraburi

|

Glass Plant

Hopper Steel Fabrication & Installation: 7.6 Tons
TN-E3 Project

Pathum Thani

|

Food Plant

Fabrication for SUS Tanks: 29 Tanks
Ethanol Plant (Praj. Section)

Prachinburi

|

Ethanol Plant

Piping Erection : 55000 DB
Phoenix Project

Khon Kaen

|

Paper Mill

Fabrication for Tanks: 6 Sets
Energy Plant, Dryer area, Sifter area, Flake area, Chipping area, Forming Line, Conti-roll machine, Finishing line, and Sanding line

Nonthaburi

|

Particle Board Plant

Design engineering drawing , fabrication and erection for structural steel,Conveyors,Bucket Elevator and operating platform, Plate work farication and erection for equipments: 1350 Tons Thermal oil Piping work : 16500 DB Fabrication for carbon and stainless steel ducting work: 270 Tons Utility Piping System: 52000 DB
Chatree North Gold Project

Phichit

|

Mining

Fabrication work: 250 Tons Conveyor Steelwork: 150 Tons
Fabrication & Supply Tank Nozzle

Prachinbuir

|

Ethanol Plant

Fabrication work: 26 Tons Supply for Tank Nozzle
ISPS International Steel Plant Services AG

Rayong

|

Steel Plant

Fabrication work: 960 Tons
Plant Extension

Pathumthani

|

Vegetable Oil

Steel Structure : 390 Tons Equipment Installation: 120 Tons
New Water Based Paint Production

Samutprakarn

|

Paint Manufacturing Plant

Piping work: 61536 DB Equipment Installation: 50 Tons Design, drawing, fabrication and erection for structural steel: 200 Tons
Concast AG - Siam Yamato Project

Rayong

|

Steel Plant

Steel structure fabrication: 1000 Tons
Tank & Storage Tank

Prachinburi

|

Ethanol Plant

Plate work: 428 Tons
Bag Filter

|

Steel Plant

Plate work of structure: 170 Tons
Cyclone Dismantle / Installation New on / 2 Units

Prachinburi

|

MDF Plant

Fabrication & Erection: 25 Tons
Fermentor & Beer well

Chachoengsao

|

Ethanol Plant

Fabrication & Erection: 275 Tons
PTT Public Co.,Ltd. South Bangkok Metering and Requlating Station

Samutprakarn

|

Refinery

Piping work and Equipment Installation: 1
Mechanical work of for KK-1 Project

Khonkaen

|

Paper Mill

Piping work: 25000 DB Equipment Install: 350 Tons Platform: 30 Tons
ES Power Ethanol Project

Srakaew

|

Ethanol Plant

Storage tank fabrication & Erection: 200 Tons
Storage , chemical,mixing and process Tank (SUS304 and Carbon steel) 108 sets

Samutprakarn

|

Paint Manufacturing Plant

Fabrication & Installaiton: 180 Tons
Tank Supply for KK1 Project

Khonkaen

|

Paper Mill

Stainless Tank Fabrication: 30 Tons
DAF 5500 Fabrication

|

Waste Water Treatment Plant

Clarifier fabrication: 36 Tons
Pre-treatment booth

|

-

Fabrication & Erection: 30 Meters
Bag Filter Project

Rayong

|

Steel Plant

Fabrication: 160 Tons
Boiler Erection

Burirum

|

Power Plant

Piping & Installation (10 MW): 615.61 Tons
Regitex Project Regitex Co.,Ltd.

Rayong

|

Chemical Plant

Equipment Installation and Piping work: 1
contact us
Do You Have A Steel Fabrication Work We Can Help With?
let us know
COPYRIGHT 2021 Summa N.K. Contracting Co. Ltd.   |   ALL RIGHTS RESERVED