Partical Board Line #3: Area for Chips cleaning, Flaking, Sawdust, Wet Silo, Energy Plant, Suction Plant, Dustfilters, Glue and Emulsion tanks, Production line Fabrication and Erection work
Client

Metro Particle Co., Ltd

purchaser

-

Job No.
149-123 , 149-130
Year
2016
Location
Prachinburi

Steel Structure: 1870 Tons Platework (Silo, Duct, Chute, etc): 480 Tons Machine Installation: 1500 Tons Piping work (Stainless and carbon steel): 20000 DB Moving Floor for Fuel bin: 210 Tons

Read more
More projects from this client.
Domestic
Wind shifter
Kanchanaburi
|
Particle Board Plant
Duct work: 20 Tons
Domestic
Dryer plant
Kanchanaburi
|
Particle Board Plant
Duct work: 40 Tons Steel Structural: 145 Tons Combustion Chamber: 32 Tons
Domestic
Energy plant
Kanchanaburi
|
Particle Board Plant
Equipment fabrication & Installation: 250 Tons Ducting work / Chimney / Vessel / Multicyclone Conveyor fabrication & Installation: 120 Tons Steel Support for Conveyor: 75 Tons
Domestic
Energy Plant, Dryer area, Sifter area, Flake area, Chipping area, Forming Line, Conti-roll machine, Finishing line, and Sanding line
Nonthaburi
|
Particle Board Plant
Design engineering drawing , fabrication and erection for structural steel,Conveyors,Bucket Elevator and operating platform, Plate work farication and erection for equipments: 1350 Tons Thermal oil Piping work : 16500 DB Fabrication for carbon and stainless steel ducting work: 270 Tons Utility Piping System: 52000 DB
contact us
Do You Have A Steel Fabrication Work We Can Help With?
let us know
COPYRIGHT 2021 Summa N.K. Contracting Co. Ltd.   |   ALL RIGHTS RESERVED