OUR projects
International
2013
Supply, Manufacture, and Delivery of ROM Wall Panels

Australia

|

Mining

Platework: 155 Tons
2012
Nui Phao Project Development

Vietnam

|

Mining

Steel Platework Fabrication Package 2: 400 Tons Pipe and SP Items Rubber Lined: 300 Tons
2012
LIHIR Project

LAOS PDR

|

Mining

Supply SAF Feedwell, Feedpipe: 14.7 Tons
2012
Phu Kham-Increased Recover Project

LAOS PDR

|

Mining

8 x TC70 Flotation cells: 120 Tons
2012
Kwale Mineral Sands Project

Kenya

|

Mining

Structural Steel Fabrication and Supply: 2000 Tons
2012
Fabrication Part

Singapore

|

-

Fabrication Part: 6.95 Tons
2011
Akyem Project

Ghana

|

Mining

Fabrication work - 3 x 42M High Rate Thickener: 784 Tons
2011
Phu Kham Upgrade Projec

LAO PDR

|

Flotation Cell TC-200

Fabrication work: 210 Tons Rubber Lining work: 2025 M2
2011
Tucano Gold Project

Brazil

|

Mining

Fabrication of Tanks and Structural Steel: 950 Tons Structural Steel Fabrication: 340 Tons
2011
Cerro Colorado Project

Chile

|

Mining

Fabrication for Horizontal / Tripper and Radial Stacker Conveyor: 145 Tons
2011
Smelter #10 Frame

Indonesia

|

Ceramic Plant

Smelter #10 Frame : 11 Tons
2010
Phu Kham Project

LAO PDR

|

Flotation Cell TC-200 , Rubber Lining for TC-200

Flotation work: 40 Tons
2010
San Andres Project

Honduras

|

Mining

Fabricatiion work: 97 Tons
2010
Contract RP137 type 1 & 2

Singapore

|

Variable Message Sign

Structural steel ( Hot dip galvanize): 90 Sets
2009
DIV 003 Mobile Tripper Project

USA

|

Mobile Tripper Conveyor 2 Sets
2009
Supply of Structural : Package 3

LAOS PDR

|

Mining

Fabrication work: 900 Tons
2009
Snapper Minerals Sands Project - 1855-0439 Structural Steel - Float Concentrator

Australia

|

Mining

All Structural Steel Fabrication work as light / Medium & Heavy, Handrailing, Galv grating: 900 Tons Work Detail : - Structural Steel = 650 Tons - Grating / Stair = 5,000 M2 - Handrailing = 2,100 M - Roofing / Cladding = 2,600 M2 - Purlin / Girt = 3,000 M
2008
Copler Project

USA

|

-

Horizontal Conveyor, Overland Conveyor, and Radial Stacker
2008
Sepon Copper Expansion Project : Package 2

LAOS PDR

|

Mining

Steel structure fabrication: 200 Tons
2008
Sepon Copper Expansion Project : Package 3

LAOS PDR

|

Mining

Steel structure fabrication: 700 Tons
contact us
Do You Have A Steel Fabrication Work We Can Help With?
let us know
Arrow Icon
COPYRIGHT 2026 Summa N.K. Contracting Co. Ltd.   |   ALL RIGHTS RESERVED