OUR projects
Domestic
Phoenix Project

Khon Kaen

|

Paper Mill

Fabrication for Tanks: 6 Sets
Energy Plant, Dryer area, Sifter area, Flake area, Chipping area, Forming Line, Conti-roll machine, Finishing line, and Sanding line

Nonthaburi

|

Particle Board Plant

Design engineering drawing , fabrication and erection for structural steel,Conveyors,Bucket Elevator and operating platform, Plate work farication and erection for equipments: 1350 Tons Thermal oil Piping work : 16500 DB Fabrication for carbon and stainless steel ducting work: 270 Tons Utility Piping System: 52000 DB
Chatree North Gold Project

Phichit

|

Mining

Fabrication work: 250 Tons Conveyor Steelwork: 150 Tons
Fabrication & Supply Tank Nozzle

Prachinbuir

|

Ethanol Plant

Fabrication work: 26 Tons Supply for Tank Nozzle
ISPS International Steel Plant Services AG

Rayong

|

Steel Plant

Fabrication work: 960 Tons
Plant Extension

Pathumthani

|

Vegetable Oil

Steel Structure : 390 Tons Equipment Installation: 120 Tons
New Water Based Paint Production

Samutprakarn

|

Paint Manufacturing Plant

Piping work: 61536 DB Equipment Installation: 50 Tons Design, drawing, fabrication and erection for structural steel: 200 Tons
Concast AG - Siam Yamato Project

Rayong

|

Steel Plant

Steel structure fabrication: 1000 Tons
Tank & Storage Tank

Prachinburi

|

Ethanol Plant

Plate work: 428 Tons
Bag Filter

|

Steel Plant

Plate work of structure: 170 Tons
Cyclone Dismantle / Installation New on / 2 Units

Prachinburi

|

MDF Plant

Fabrication & Erection: 25 Tons
Fermentor & Beer well

Chachoengsao

|

Ethanol Plant

Fabrication & Erection: 275 Tons
PTT Public Co.,Ltd. South Bangkok Metering and Requlating Station

Samutprakarn

|

Refinery

Piping work and Equipment Installation: 1
Mechanical work of for KK-1 Project

Khonkaen

|

Paper Mill

Piping work: 25000 DB Equipment Install: 350 Tons Platform: 30 Tons
ES Power Ethanol Project

Srakaew

|

Ethanol Plant

Storage tank fabrication & Erection: 200 Tons
Storage , chemical,mixing and process Tank (SUS304 and Carbon steel) 108 sets

Samutprakarn

|

Paint Manufacturing Plant

Fabrication & Installaiton: 180 Tons
Tank Supply for KK1 Project

Khonkaen

|

Paper Mill

Stainless Tank Fabrication: 30 Tons
DAF 5500 Fabrication

|

Waste Water Treatment Plant

Clarifier fabrication: 36 Tons
Pre-treatment booth

|

-

Fabrication & Erection: 30 Meters
Bag Filter Project

Rayong

|

Steel Plant

Fabrication: 160 Tons
Boiler Erection

Burirum

|

Power Plant

Piping & Installation (10 MW): 615.61 Tons
Regitex Project Regitex Co.,Ltd.

Rayong

|

Chemical Plant

Equipment Installation and Piping work: 1
KK1 Project

Khonkaen

|

Paper Mill

Storage Tank / Tower Tank / Fabrication & Erection: 210 Tons
Machine Installation

Pathum Thani

|

Tyre Plant

Equipment Installaiton: 350 Tons
Waste Plant Project

Kanchanaburi

|

Pulp Mill

Piping work: 20000 DB Equipment Installation: 200 Tons Tank Erection: 30 Tons
Storage Tank

Saraburi

|

Ethanol Plant

Fabrication & Erection: 105 Tons
Dryer Duct SUS304

Kanchanaburi

|

MDF Plant

Fabrication & Installation: 140 Tons
Cooling wheel & Welding Jig

Kanchanaburi

|

MDF Plant

Fabrication & Installation: 62 Tons
Fuel bin & Submerge Conveyor

Kanchanaburi

|

MDF Plant

Fabrication & Installation: 80 Tons
Chimney & Duct work

|

Food Plant

Fabrication & Installation: 40 Tons
Tank Fabrication for TUPI #9

Kanchanburi

|

Paper Mill

Storage Tank: 0 Tons
Dryer Project

Khonkaen

|

Sugar Plant

Dryer Fabrication: 45 Tons
Yankee dryer PM.2 and Installation work (Crane Operation)

Samutprakarn

|

Paper Mill

Installation work (Dismantle & New Replace): 1
Piping System

Chaiyapoom

|

Food Plant

Piping work (SUS304): 18000 DB Valve: 1560 In-Pcs
Dissolving Tank Vent Gases Scrubbling System for Pulp Mill 1

Prachinburi

|

Paper & Pulp Mill

Fabrication work: 24 Tons Piping work: 4000 DB
200 M3 Pressure Vessel SUS 304L

Prachinburi

|

Paper & Pulp Mill

Tank Erection: 45.8 Tons
Piping work

Chonburi

|

Steel Plant

Piping work: Minor DB
ARP and PPPL for Equipment Installation work

Chonburi

|

Steel Plant

Installation work: 822.95 Tons
Suwannaphume Airport ( BAFS) JP-One and Into plane

Samutprakarn

|

Aviation Fuel

Piping work: 24264 DB
Equipment Installation

Pathum Thani

|

Tyre Plant

Machine Installation: 662 Tons
Tunnel work for Scrubber System of SM#1 - 10

Saraburi

|

Ceramic Plant

Fabrication and Installation: 64 Tons
Equipment Fabrication

|

Plywood Plant

Fabrication work: 46 Tons
Stack and Ducting work of SM# 1- 8

Saraburi

|

Ceramic Plant

Fabrication and Installation: 73 Tons
Stainless Steel Tank (17 Units)

|

Plywood Plant

Fabrication work: 25.74 Tons
Belt Conveyor

Rayong

|

-

Fabrication work: 16.4 Tons
PAC 355-L MK 15

Rayong

|

-

Fabrication work: 8.94 Tons
Cat Walk & Platform & Grating

Rayong

|

-

Fabrication work: 14.63 Tons
Hood Support Structure

Prachinburi

|

-

Fabrication work: 31.29 Tons
Reaction Tank 60 M3

Nakornrachasrima

|

Starch Plant

Fabrication work: 35.2 Tons
Equipment Installation for ESP 2 Unit

Prachinburi

|

Paper & Pulp Mill

Equipment Installation - Recovery Boiler Unit: 810 Tons
Dissolving Tank Vent Gases Scrubbling System for Pulp Mill 2

Prachinburi

|

Paper & Pulp Mill

Fabrication work: 24 Tons Piping work: 4000 DB Insulation work: 500 Sqm.
Evaporator 1 Upgrade

Prachinburi

|

Paper & Pulp Mill

Piping work: 8200 DB Equipment Installation: 25 Tons Relocate Equipment: 30 Tons Insulation work: 2000 Sqm. Platform: 6000 Tons
Cooling Water Piping Pulp 2

Prachinburi

|

Paper & Pulp Mill

Piping work: - DB
Stock prepartion PM #5 Modification

Samuprakarn

|

Paper Mill

Machine Installation: 50 Tons Existing M/C Relocate
Equipment Installation

Prachinburi

|

Paper Mill

Machine Installation: 1600 Tons Fabrication and installation works: 2000 Tons
SBIA Aviation Fuel Depot Project Suwanaphum Airport - Bangkok Aviation Fuel Services Public Co.,Ltd

Samutprakarn

|

Aviation Fuel

Piping work for fuel & Water line Carbon steel pipe: 47200 DB SUS304 pipe: 3100 DB Equipment Installation: 30 Tons
Ball Mill #3 Plant Extension

Nakornpathom

|

Mineral Plant

Silo Equipment Fabrication: 90 Tons Structure & Platform: 75 Tons Conveyor: 12 Sets Equipment installation Machine: 200 Tons Silo , Str. / P / F: 165 Tons
Acrylic resin plant expansion project

Samutsakorn

|

Chemical Plant

Piping work: 10000 DB Fab. & Erection work: 39.2 Tons Carbon steel Tank : 34.9 Tons SUS 304 Tank : 4.3 Tons
Starch Granulation Phase #2

Samutsakorn

|

Chemical Plant

Piping work: 0 DB Fabrication & Erection: 150 Tons
Fire fighting piping work

Samutsakorn

|

Chemical Plant

Piping work
Yala Green Power Project

Yala

|

Power Plant

Steel structure fabrication: 423 Tons Conveyor: 152 Tons Vessel / Chute: 15 Tons
Chlorine Dioxide Plant

Nakornsawan

|

Chemical Plant

Equipment Installation: 180 Tons Piping work: 0
Smelter Extention

Sarabuir

|

Ceramic Plant

Smelter Frame #8 , Recuperator Smelter, Quencher basket , Ribbon blender, Screw Feeder , Smelter Feeder, Chimney, Duct work, Structure & Platform : 150 Tons
Slurry Tank & Silo

Chaiyaphoom

|

Starch Plant

Fabrication & Installation: 90 Tons
Roller Washer

Chaiyaphoom

|

Starch Plant

Fabrication work: 84 Tons
Soaking Drum

Chaiyaphoom

|

Starch Plant

Fabrication work: 61 Tons
Storage Tank

Chaiyaphoom

|

Starch Plant

Fabrication work: 10 Tons
Equipment & Structure

Chaiyaphoom

|

Starch Plant

Fabrication & Erection: 380 Tons
Segment Mold Fabrication work

Mokdaharn

|

Form work

Fabrication work: 252 Tons
Silo 170 M3 Dia.3.6m x 20.928 ml

Nakornpathom

|

Starch Plant

Fabrication & Erection: 16 Tons
Full round forms Dia 3 M

Mokdaharn

|

Form work

Fabrication work: 68 Tons
Nippon Tank for New Resin Plant

Chachengsoa

|

Chemical Plant

Fabrication work: 45 Tons
Cutsize sheeter installation

Prachinburi

|

Paper & Pulp Mill

Machine installation: 168 Tons
Bua Sommai 6 MW Rice Husk Fueled Power plant , Roi-et

Roi-et

|

Power Plant

Mechanical Erection: 510 Tons Boiler welding work: 0 DB Fabrication of Chimney Ducting, Platform & Ladder: 72 Tons
EGAT (Wangnoi) Wangnoi Combined Cycle Power Plant

Auythaya

|

Power Plant

Piping Gas Compressor: 46 Tons Civil / Electrical Work / Modify / Insulation: 0
Casting Machine Fabrication

|

Ceramic Plant

Fabrication work: 30 Tons
Smelter #7 Extention

Saraburi

|

Ceramic Plant

Recuperator Smelter: 12 Tons Smelter frame #7: 3 Sets
Storage Tank Ajinomoto (Thailand) Co., Ltd.

Kamphaengphet

|

Food Plant

Fabrication work: 40 Tons
Dryer plant

Kanchanaburi

|

Particle Board Plant

Duct work: 40 Tons Steel Structural: 145 Tons Combustion Chamber: 32 Tons
Energy plant

Kanchanaburi

|

Particle Board Plant

Equipment fabrication & Installation: 250 Tons Ducting work / Chimney / Vessel / Multicyclone Conveyor fabrication & Installation: 120 Tons Steel Support for Conveyor: 75 Tons
Wind shifter

Kanchanaburi

|

Particle Board Plant

Duct work: 20 Tons
Storage tank

Singburi

|

Paper Mill

Fabrication work: 25 Tons
Hydrapulper

Singburi

|

Paper Mill

Fabrication & Erection: 12 Tons
Fuel Gas Channel

Saraburi

|

-

Fabrication work: 16 Tons
Klin car 135 Sets

Saraburi

|

-

Fabrication work: 110 Tons
HP Steam Line Erection

Prachinburi

|

Paper & Pulp Mill

Piping Work: 2882 DB Sch 100 A335 P11 , 13 CrMo44 , AISI 316
Pulp Drying Machine roof structure work

Prachinburi

|

Paper & Pulp Mill

Steel Structure erection: 40 Tons
False ceiling extension for MP1

Prachinburi

|

Paper & Pulp Mill

Modify work: -
EGAT (Lankrabue) Inter Connecting Pipe,Lankrabue Project

Kamphaengphet

|

Power Plant

Pipe C/S API - 5L Gr.B , SUS304 Sch40 , Radiographic test (Random): 1
Casting Machine

Saraburi

|

Ceramic Plant

Fabrication work: 105 Tons
Recupertor, Quench basket, p/f & chimney etc.

Saraburi

|

Ceramic Plant

Fabrication & Installation: 70 Tons
Chimney

Kamphaengphet

|

Food Plant

Fabrication & Installation: 60 Tons
Thai Preserve Project

Nakornpathom

|

Food Plant

Fabrication & Installation: 42 Tons
Silo SUS304 50 M3 3 Set

Nakornpathom

|

Food Plant

Fabrication & Installation: 24 Tons
Roof Entrance and Ticket Room : MRTA Project

Bangkok

|

Metropolitan Rapid Transit, Chaloem Ratchamongkhon Line

Fabrication & Installation: Roof Entrance 160 Tons and Ticket Room 35 Tons
Steel making plant

Chonburi

|

Steel Plant

Piping C/S and SUS304: 60181 DB Machine Installation: 2264 Tons
Rolling Mill Piping

Nakhonratchasima

|

Steel Plant

Piping C/S sch40 & SUS304 sch10: 38300 In-m Support: 17.6 Tons
Steam piping shutdown

|

Paper Mill

Piping work: 2200 DB
Storage Tank SUS304 & Pulper

Samutsakorn

|

Paper Mill

Fabrication & Erection: 32 Tons
Hot Oil Pipe Modify Work

Prachinburi

|

MDF Plant

Piping API 5L Sch 40 SMLS: 1910 DB Support: 3.4 Tons Piping API5L Sch 40: 1848 DB
contact us
Do You Have A Steel Fabrication Work We Can Help With?
let us know
COPYRIGHT 2024 Summa N.K. Contracting Co. Ltd.   |   ALL RIGHTS RESERVED